







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
CGI Bathroom Remodeling: The Fairfield Owner’s Guide
CGI bathroom remodeling in Fairfield typically runs $9,000 to $28,000 installed, depending on the scope, the tile, and how much of the plumbing rough-in has to be moved. Larger full-gut jobs land toward the top of that range; smaller footprint baths land near $5,000 to $12,000. We schedule these as planned projects, not same-day work, because a bathroom remodel needs permits, curing time, and inspections to hold up. Bradford Remodeling Co Fairfield is an independent contractor and is not affiliated with CGI.
Owners usually find out something’s wrong the same way. A cabinet run sits proud of the wall along the tub. The tile line over the old substrate starts to pop within a year. A shower pan flexes underfoot because the base was set over subfloor that had been wet. Or a fixture gets delivered in the wrong rough-in depth, and the scope has to change after the wall’s already closed. In Fairfield, we regularly see warped vanities and cracked grout lines in older homes where the substrate was never brought up to spec before the new bath went in.
Key Takeaways
- Fairfield bathroom remodels: $9,000 to $28,000; smaller baths: $5,000 to $12,000.
- Walk-in shower install: $4,500 to $12,000; tub-to-shower conversion: $3,500 to $10,000.
- Vanity install: $800 to $3,000; shower replacement: $3,000 to $8,500.
- Every Fairfield job gets a written price before work starts and the 365-Day Done Right Promise on completion.
Which CGI Models This Applies To

CGI cabinet and vanity lines have been spec’d in Fairfield bathrooms across several series, and the compatibility question comes down to three things: door/drawer overlay style, cabinet depth, and whether the existing rough-in matches the new vanity’s plumbing cutout. Standard CGI bath vanities are built in 18-, 21-, and 24-inch depths, and the depth determines how much floor clearance you lose against a wall or a shower curb. A 24-inch vanity that replaces an 18-inch one will push your drain stub-out and supply lines off-center, which means moving rough-in, which means the job gets bigger.
To identify what’s already installed, look for the series label on the inside of a cabinet door or the back panel of a drawer box. Measure the door overlay: full-overlay doors sit nearly flush; partial-overlay doors leave a visible frame edge. That measurement is what tells us whether a new CGI door or box will drop in or whether the whole run has to be rehung. On the OEM-versus-aftermarket call, CGI’s own replacement parts hold the factory dimensions and finish, which matters if you’re matching an existing run. Quality aftermarket doors exist, but color matching across a white or painted finish often drifts. For Fairfield bathrooms where the client is doing a full remodel rather than a single-door replacement, we spec full runs and document the series on the quote.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your CGI Bathroom Remodeling Is Failing
These are the symptoms we see in Fairfield when a CGI-spec’d bath is heading toward a redo. Each one points to a specific underlying cause.
- Doors that drag or stick seasonally. Fairfield’s wet-winter, dry-summer cycle swells MDF and particleboard boxes. If the cabinet door drags in January and frees up by July, the box is absorbing humidity and the hinge screws have loosened in oversized pilot holes.
- Caulk lines re-cracking along the tub or shower pan. That’s movement, not bad caulk. Either the pan wasn’t set on a proper mortar bed or the wall board behind the tile has flexed. Recaulking hides it for a season at most.
- Grout cracking in a vertical line above the shower curb. Vertical cracks track back to framing or substrate movement. In 40- to 60-year-old Fairfield homes, that’s often a sign the backer board was set over greenboard or drywall, which was never waterproof.
- A shower pan that flexes or sounds hollow when you step in. The pan lifted off its setting bed. Left alone, water gets under it and rots the subfloor from below, and you’ll only see the damage once the tile comes up.
- Vanity drawers that no longer meet the counter edge cleanly. The cabinet has sagged because the wall it’s hung on is out of plumb, or the floor is out of level and the vanity was set without shimming. Fairfield’s older slab-on-grade floors are commonly out by a quarter-inch over six feet.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Fairfield bathroom remodeling through Bradford runs $9,000 to $28,000 installed. That includes demo, permits and inspection, substrate and waterproofing, tile set, fixture install, and a written scope you sign before any tool comes out. Smaller baths run $5,000 to $12,000. To price the individual line items:
| Item | Installed Range |
|---|---|
| Walk-in shower installation | $4,500 – $12,000 |
| Tub-to-shower conversion | $3,500 – $10,000 |
| Shower replacement | $3,000 – $8,500 |
| Bathroom vanity installation | $800 – $3,000 |
What moves the range: tile selection, whether the drain and supply lines have to move, whether the substrate needs full replacement, and how much the cabinetry run costs. Parts and labor are quoted as separate line items, so you can see the material cost and the labor cost on the same sheet. The 365-Day Done Right Promise covers the completed installation for a full year. If the work fails inside that window, we come back and correct it at no charge. We also install KraftMaid, Cambria, and Silestone surfaces alongside the CGI cabinetry when a client wants to mix lines. Every Fairfield project starts with a live person answering the phone, a written price, and background-checked, uniformed technicians on site.
DIY or Call Us?
What’s safe to check yourself: measuring the cabinet depth and door overlay, noting where the drain and supply lines sit relative to the new vanity footprint, photographing any cracks or flexing so we can talk through them, and confirming the series label inside a door. Don’t pull a tub or a shower pan yourself. Removing a waterproofed assembly without addressing the substrate behind it turns a $9,000 bathroom into a $20,000 one, and standing water under the shower pan for even a season rots framing in ways you can’t see until it’s torn out. Don’t attempt to re-route plumbing, and don’t tile over a failing substrate. In Fairfield, we’ve seen owners spend a weekend pulling a shower pan and then call us with a subfloor that needs full replacement. Give us the call instead. Bradford Remodeling Co Fairfield answers the phone with a live person, 24/7, and a written price comes before work starts. The estimate is free. Call (833) 998-3242.
FAQs

A properly installed CGI bathroom with a waterproofed substrate and a set shower pan will last 15 to 25 years before a full redo, and the cabinetry itself will hold for 20-plus years if the box stays dry. What shortens it is Fairfield’s wet-dry seasonal swing on any MDF or particleboard cabinet that’s been exposed to moisture, usually from a shower pan or ceiling leak. Keeping the caulk lines intact and the exhaust fan working is what gets you to the far end of that range. Call (833) 998-3242 for a free estimate.
Sometimes yes. A single door or drawer that has swelled can often be replaced with an OEM match if the box is sound, and a vanity that’s out of level can be re-shimmed rather than replaced. What can’t be repaired is a box that’s absorbed water and delaminated, or a shower pan that’s lost its setting bed; those need replacement because the failure is underneath the finish. We’ll tell you which side of that line you’re on after a site walk. Call (833) 998-3242 for the free estimate.
A vanity-only swap in a Fairfield bath runs one to two days. A shower replacement runs three to five days. A full bath remodel with tile, substrate, and permits runs two to four weeks, mostly because of curing time and inspection scheduling. Those are planned projects, not same-day work, and we tell you the schedule in writing before the first tool comes out. Call (833) 998-3242 to get your written schedule and price.
We source CGI product through manufacturers and supplier channels, with the series and model documented on the written quote so the specification is traceable. We don’t stock parts and we don’t carry parts on a truck. That means the exact cabinet, vanity, or door gets ordered against your confirmed measurement rather than substituted at the last minute. If something doesn’t match the spec on delivery, we handle it before installation, not after. Call (833) 998-3242 to schedule your free estimate.
Written by the team at Bradford Remodeling Co Fairfield, serving Fairfield and nearby areas.












