







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Mr-Glass Driveway & Pavers: The Fairfield Owner’s Guide
If a Mr-Glass driveway or paver system on your Fairfield property has cracked, settled, or come loose, we source the matched material and install it for a typical $7,000 – $18,000 on a paver driveway and $4,500 – $12,000 on concrete. That range covers tear-out, base prep, material, and a written price given before any work begins. Most owners discover the failure the same way: a hairline joint opens after a wet winter, one paver rocks underfoot by the front step, or a section of driveway shears away from the garage apron. By the time it’s visible, water has usually been working under the base for one or two seasons.
Key takeaways
- Installed paver driveway runs $7,000 – $18,000 in Fairfield; concrete runs $4,500 – $12,000.
- We give you a written price before work starts – a real number, not “call for a quote.”
- Every install carries the 365-Day Done Right Promise: if it fails inside a full year, we return and correct it at no charge.
- We’re an independent contractor, not affiliated with Mr-Glass; we match the material to what’s already on your property.
Which Mr-Glass Models This Applies To

Mr-Glass markets pavers and driveway systems across several product lines, and the compatibility question that trips up most Fairfield owners isn’t the brand name – it’s the dimensions and finish. Pavers are sold by nominal size, and a 4×8-inch unit from one line will not line up with a 60mm-thick unit from another, even if the surface color looks identical in a photo. Before we order anything we measure your existing units in the field: length, width, thickness, joint spacing, and the actual color lot.
To identify what you have, check for a pallet label or a box tag, often still stapled under the deck or behind the garage. If the labels are gone, the thickest reliable distinguishing mark is thickness – most residential pavers sit in a 60mm to 80mm range, and a system built on 80mm units won’t take 60mm replacements without a base rework. Color matching matters less than size for structure, but a mismatched lot is the fastest way to make a repair visible from the street.
On OEM versus aftermarket: a true Mr-Glass match is worth chasing if you’re keeping the whole system and want an invisible repair. If you’re rebuilding a tired section, a quality alternative in the same nominal dimensions does the structural job fine and sometimes gets you a denser unit for the same money. We’ll tell you which path we think is right, in writing, before you commit.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Mr-Glass Driveway & Pavers Is Failing
- Pavers that rock underfoot. The sand between units has washed out and the base has lost its compaction. When an individual paver moves, the problem is underneath, not on top.
- Joint sand that keeps disappearing. Water is running through the joints instead of off the surface. In Fairfield what looks like a drainage nuisance is usually a grade problem, and the sand is just the messenger.
- Heaving or dips near the garage apron. That’s subgrade movement, often trapped moisture. It reads as a small puddle now; left alone it becomes a failed section at the transition.
- Cracks running along a concrete or paver driveway panel. Shrinkage is normal in the first year or two, a widening crack is not. A crack that keeps growing points to a base that wasn’t deep enough.
- Efflorescence and white powdery stains. Salt is being drawn out by moisture cycling through the slab. Persistent staining after a wet season says water is getting in from below.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Here are the real installed ranges we work from in Fairfield. These are complete jobs, not material-only numbers.
| Job | Installed range (Fairfield) |
|---|---|
| Paver driveway installation | $7,000 – $18,000 |
| Concrete driveway installation | $4,500 – $12,000 |
| Asphalt driveway paving | $3,500 – $9,000 |
| Driveway replacement | $5,000 – $14,000 |
| Driveway sealing | $250 – $700 |
| Paver patio installation | $3,500 – $11,000 |
What drives you toward the top of a range: square footage, how much old material has to come out, whether the base needs re-grading, and edge restraint details. Our price is broken into line items – tear-out, base, material, labor, disposal – so you can see where the money goes. No change orders after the price is signed. Every completed install is covered by the 365-Day Done Right Promise; if the work fails inside a year, we come back and fix it at no charge.
DIY or Call Us?
A few things are genuinely safe to check yourself. Walk the driveway after rain and note where water pools. Rock individual pavers by hand to find movement. Photograph any crack with a tape measure in frame so you can see if it’s growing. Check the pallet label if one survived. That tells us a lot before we’re ever on site.
Where homeowners go wrong: pulling pavers out of a locked field to inspect the base, and then trying to reset them. Once a sloped or interlocked field comes apart, re-compacting it properly needs plate equipment and the right bedding depth. You end up with one section sitting a quarter-inch proud of its neighbors and a new low spot that gathers water. On a driveway this matters more than on a patio, because it’s load-bearing every day. Call us at (833) 998-3242 to schedule your free estimate and we’ll come look at the base before you pull anything.
FAQs

A properly installed paver driveway should hold 25 to 30 years, and a well-poured concrete driveway 20 to 25. Fairfield’s clay-heavy soil and wet winters are the real test – base prep and drainage decide whether you get the full lifespan. Call (833) 998-3242 for an exact quote; estimates are free.
Often yes, if the damage is localized and the base under the good sections is still sound. We lift the affected units, re-compact the base, and reset matched material. A full replacement is the honest recommendation only when the base has failed across the field. Call (833) 998-3242 to schedule a free estimate and we’ll tell you which one you’re facing.
A paver patio runs 2 to 4 days; a full paver driveway usually 3 to 5, weather depending. Concrete needs 24 to 48 hours before traffic, plus cure time. Because we inspect the base and quote before we start, you’ll know the schedule in writing. Call (833) 998-3242 to book an estimate.
We match on measured dimensions and color lot first, then confirm availability with the supplier before we commit to a written price. We don’t claim to stock Mr-Glass parts, so the material is ordered to match your project. Call (833) 998-3242 to schedule your free estimate.
When you’re ready to price the job, call (833) 998-3242 for a free estimate. You’ll get a written, line-item price before any work starts, background-checked technicians on the job, and a live person on the phone 24/7, plus the 365-Day Done Right Promise on every completed project. We’re an independent contractor, not affiliated with Mr-Glass, and we also handle KraftMaid, Cambria, and Silestone projects.
Written by the team at Bradford Remodeling Co Fairfield, serving Fairfield and nearby areas.












